Mining Goes Digital 2019
DOI: 10.1201/9780429320774-51
|View full text |Cite
|
Sign up to set email alerts
|

Short-term open-pit mine production scheduling with hierarchical objectives

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1

Citation Types

0
3
0

Year Published

2021
2021
2024
2024

Publication Types

Select...
5

Relationship

0
5

Authors

Journals

citations
Cited by 6 publications
(3 citation statements)
references
References 1 publication
0
3
0
Order By: Relevance
“…Manriquez et al (2019. short-term open-pit mine production scheduling with hierarchical objectives) developed a short-term planning approach to optimise multiple hierarchical objectives in mining.…”
Section: Review Of Short-term Mine Planningmentioning
confidence: 99%
See 1 more Smart Citation
“…Manriquez et al (2019. short-term open-pit mine production scheduling with hierarchical objectives) developed a short-term planning approach to optimise multiple hierarchical objectives in mining.…”
Section: Review Of Short-term Mine Planningmentioning
confidence: 99%
“…The model produces weekly extraction schedules for a three-month planning horizon. Manriquez et al (2019. short-term open-pit mine production scheduling with hierarchical objectives) developed a short-term planning approach to optimise multiple hierarchical objectives in mining. Objectives include minimising maximum deviation between ore tonnage and plant capacity, metal fines and expected metal fines, and shovel fleet movement cost.…”
Section: Mixed Integer Programming-based Modelsmentioning
confidence: 99%
“…Mirzaei-Nasirabad et al (2019) modify Li (1990) and Temeng et al (1998) model to evaluate the truck allocation plan with different strategies. Manríquez et al (2019) propose a deterministic mixed-integer linear programming model for short-term scheduling in open-pit mines through optimizing multiple hierarchical objectives over a given time horizon. This model considers mining sequencing constraints and is also concerned about shovel allocation decisions based on the time and cost of shovels movement between phases.…”
Section: Introductionmentioning
confidence: 99%