2020
DOI: 10.33445/sds.2020.10.1.7
|View full text |Cite
|
Sign up to set email alerts
|

Simulation model of the communication repair process in the mechanized brigade repair unit

Abstract: The article analyzes the current state of information exchange in the control system of a mechanized brigade during its combat operations in the anti-terrorist operation, the operation of the combined forces of the Armed Forces of Ukraine in the east of the country. It is determined that the mechanized crew communication system has a low level of survivability. The cause is a large amount of communication damage due to enemy fire damage and limited technical reliability. Maintaining a given level of survivabil… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2024
2024
2024
2024

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 0 publications
0
1
0
Order By: Relevance
“…Secondly, during the installation process, it is necessary to strengthen the analysis of the design scheme, ensure that the installation position is consistent with the design scheme, and implement scientific dust removal measures to prevent excessive dust from affecting the installation effect. Finally, during the installation process of the ventilation system, due to the presence of a large number of concealed engineering projects and the irreversible nature of the installation process, it is necessary to strengthen the analysis of maintenance and repair during installation, reserve more space, and lay a solid foundation for subsequent construction and maintenance (Ishchenko, 2020;Senchenko et al, 2020). The ventilation system plays a crucial role, and to meet installation requirements, it is necessary to strengthen the optimization selection of processes, materials, and personnel.…”
Section: Ventilation System Installation and Construction Technologymentioning
confidence: 99%
“…Secondly, during the installation process, it is necessary to strengthen the analysis of the design scheme, ensure that the installation position is consistent with the design scheme, and implement scientific dust removal measures to prevent excessive dust from affecting the installation effect. Finally, during the installation process of the ventilation system, due to the presence of a large number of concealed engineering projects and the irreversible nature of the installation process, it is necessary to strengthen the analysis of maintenance and repair during installation, reserve more space, and lay a solid foundation for subsequent construction and maintenance (Ishchenko, 2020;Senchenko et al, 2020). The ventilation system plays a crucial role, and to meet installation requirements, it is necessary to strengthen the optimization selection of processes, materials, and personnel.…”
Section: Ventilation System Installation and Construction Technologymentioning
confidence: 99%