Simulation of calendar planning in Building information modelling programms and regression detailing of construction period rules

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
5
0

Year Published

2015
2015
2024
2024

Publication Types

Select...
6

Relationship

0
6

Authors

Journals

citations
Cited by 8 publications
(5 citation statements)
references
References 0 publications
0
5
0
Order By: Relevance
“…This paper, however, suggests a deeper study of comprehensive trial modeling of technical processes aimed at the final performance indicators with a simultaneous variance of the following:  construction jobs' synchronization degrees at the beginning and end;  construction and installation work performance sequence;  hidden idle time of crew units for process and other reasons;  unit productivity.  the performance of crews  the integration level of a crew  the reliability of a crew Granted invariance of the result, as the model under consideration is formed it is conceivable that all its elements can and must be capable of being rearranged and of changing as the model functions if this is necessary to achieve a high-quality end result [18,19].…”
Section: Resultsmentioning
confidence: 99%
“…This paper, however, suggests a deeper study of comprehensive trial modeling of technical processes aimed at the final performance indicators with a simultaneous variance of the following:  construction jobs' synchronization degrees at the beginning and end;  construction and installation work performance sequence;  hidden idle time of crew units for process and other reasons;  unit productivity.  the performance of crews  the integration level of a crew  the reliability of a crew Granted invariance of the result, as the model under consideration is formed it is conceivable that all its elements can and must be capable of being rearranged and of changing as the model functions if this is necessary to achieve a high-quality end result [18,19].…”
Section: Resultsmentioning
confidence: 99%
“…For greater efficiency and lower costs of the 4D modeling process, the Level of Development of a 3D model and the network schedule level should be synchronized at the earliest stage possible [9,10]. This is to ensure each activity in the network schedule is assigned to one or more 3D model elements and vice versa.…”
Section: Methodsmentioning
confidence: 99%
“…Research with the use of «information» modeling is conducted in the following areas:  imitation of calendar planning in building information modeling programs [16]. The article proposes a methodology for the economic assessment of the entire building at any time of its design based on the use of the Revit platform;…”
Section: Methodsmentioning
confidence: 99%