Simulation of Execution Alternatives Using Chronographic Scheduling Logic

Abstract: Abstract-The more complex a project is, the more attractive non-traditional project delivery methods like Design-Build become. These delivery methods allow decisions with several options to be postponed. To account for these alternatives, existing generalized scheduling methods integrate decisions into their processes; however, these methods only use traditional precedence dependencies for network calculations. This paper contributes to the existing body of knowledge by extending the traditional logic and mode… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1

Citation Types

0
4
0

Year Published

2017
2017
2023
2023

Publication Types

Select...
5
1

Relationship

1
5

Authors

Journals

citations
Cited by 6 publications
(4 citation statements)
references
References 10 publications
0
4
0
Order By: Relevance
“…During the design phase, 3D and 4D modeling techniques can be used to simulate the construction process through the BIM model and detect operation succession errors and space use conflicts (Francis, 2019). As more information becomes available over time and the level of risk decreases, it becomes much easier to make better-informed decisions according to the status of the project or based on the available budget (Francis and Miresco, 2016).…”
Section: The Benefits Of 3d/4d Modeling In Bim Adoptionmentioning
confidence: 99%
“…During the design phase, 3D and 4D modeling techniques can be used to simulate the construction process through the BIM model and detect operation succession errors and space use conflicts (Francis, 2019). As more information becomes available over time and the level of risk decreases, it becomes much easier to make better-informed decisions according to the status of the project or based on the available budget (Francis and Miresco, 2016).…”
Section: The Benefits Of 3d/4d Modeling In Bim Adoptionmentioning
confidence: 99%
“…During the pre-construction phase, 3D and 4D modeling techniques can be used to simulate the construction process through a BIM model and detect operation succession errors and space use conflicts (Francis, 2019). As more information becomes available over time and the level of risk decreases, it becomes much easier to make better-informed decisions according to the status of the project or based on the available budget (Francis and Miresco, 2016). Current scheduling methods do not account for spatiotemporal constraints, which leads to less than optimal scheduling.…”
Section: Bim In the Pre-construction Phasementioning
confidence: 99%
“…Many decisions during construction are postponed due to the parallelism of design and construction activities faced by highly complex projects such as infrastructure and industrial projects (Francis and Miresco, 2016). BIM has become a common process and technology used in the management of construction projects (Puolitaival and Forsythe, 2016).…”
Section: Introductionmentioning
confidence: 99%
“…The objective of the paper is to propose a complete allocation methodology compatible with the Chronographic Modeling [11][12][13][14][15].…”
mentioning
confidence: 99%