2022 Advances in Science and Engineering Technology International Conferences (ASET) 2022
DOI: 10.1109/aset53988.2022.9734873
|View full text |Cite
|
Sign up to set email alerts
|

Simulation of Wastewater Treatment Performance of Sequencing Batch Reactor under Seasonal Variations Using GPS-X: A Case Study in Sharjah, UAE

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2

Citation Types

0
0
0

Year Published

2023
2023
2024
2024

Publication Types

Select...
2

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(4 citation statements)
references
References 7 publications
0
0
0
Order By: Relevance
“…TWW is regarded as one of the most critical and effective solutions to Jordan's water shortage [ 14 , 15 ]. Previous studies used a GPS-X simulator to improve the performance of WWTPs [ 23 , 24 ]. In Karbala wastewater treatment plants, there was a particular focus on the addition of external carbon sources to enhance denitrification and reduce phosphate concentrations [ 23 ], while in the Sharjah case study, the TSS, COD, TKN, and cBOD5 were used to support decision-making strategies and deliver cost savings by reliably evaluating the TWW quality [ 24 ] Additionally, some studies used Capdetwork software alongside GPS-X to calculate the economic costs [ 34 ].…”
Section: Discussionmentioning
confidence: 99%
See 2 more Smart Citations
“…TWW is regarded as one of the most critical and effective solutions to Jordan's water shortage [ 14 , 15 ]. Previous studies used a GPS-X simulator to improve the performance of WWTPs [ 23 , 24 ]. In Karbala wastewater treatment plants, there was a particular focus on the addition of external carbon sources to enhance denitrification and reduce phosphate concentrations [ 23 ], while in the Sharjah case study, the TSS, COD, TKN, and cBOD5 were used to support decision-making strategies and deliver cost savings by reliably evaluating the TWW quality [ 24 ] Additionally, some studies used Capdetwork software alongside GPS-X to calculate the economic costs [ 34 ].…”
Section: Discussionmentioning
confidence: 99%
“…Once the plant reaches its maximum design inflow of 10,000 m 3 /day the third sedimentation tank must operate to enhance the plant's performance and sustain it. Previously [ 23 , 24 ], analysed the performance of WWTPs by using the GPS-X simulator and reported an overall performance improvement in the outcomes of the WWTPs and stated the best scenarios. Hence our result is in alignment with previous studies as the majority of them agreed on the beneficial uses of the GPS-X model.…”
Section: Discussionmentioning
confidence: 99%
See 1 more Smart Citation
“…The global population was estimated to be around 7.8 billion in 2020, and there is significant population growth. The availability and consumption of fresh water and the treatment of the resulting effluent are all severely impacted by such rapid growth [1]. Moreover, due to the migration of people from rural to urban areas, the amount of municipal wastewater generation has augmented in cities [2].…”
Section: -Introductionmentioning
confidence: 99%