Proceedings of SPE Production Operations Symposium 1995
DOI: 10.2523/29539-ms
|View full text |Cite
|
Sign up to set email alerts
|

Single-Trip Completion Concept Replaces Multiple Packers and Sliding Sleeves in Selective Multi-Zone Production and Stimulation Operations

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

1999
1999
2014
2014

Publication Types

Select...
3

Relationship

0
3

Authors

Journals

citations
Cited by 3 publications
(1 citation statement)
references
References 0 publications
0
1
0
Order By: Relevance
“…Completions for multiple fractured horizontal wells have been a constant issue since the technology became popular in the early 1990's. In the North Sea, several methods of perforating, stimulating, and isolating have been utilized to improve well completion efficiency and fracture stimulation placement [8][9][10][11][12] . Although effective, these completion techniques struggled to find an on-shore commercial market in tight and unconventional gas reservoirs [13][14][15][16] where more completions and fractures are desired per foot of lateral length.…”
Section: Introductionmentioning
confidence: 99%
“…Completions for multiple fractured horizontal wells have been a constant issue since the technology became popular in the early 1990's. In the North Sea, several methods of perforating, stimulating, and isolating have been utilized to improve well completion efficiency and fracture stimulation placement [8][9][10][11][12] . Although effective, these completion techniques struggled to find an on-shore commercial market in tight and unconventional gas reservoirs [13][14][15][16] where more completions and fractures are desired per foot of lateral length.…”
Section: Introductionmentioning
confidence: 99%