Space-Time Repetitive Project Scheduling Considering Location and Congestion

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
25
0
1

Year Published

2018
2018
2023
2023

Publication Types

Select...
7
2

Relationship

3
6

Authors

Journals

citations
Cited by 40 publications
(26 citation statements)
references
References 37 publications
0
25
0
1
Order By: Relevance
“…Uncertainties and particular requirements by the owner can cause the construction period of the project to change. In recent years, construction accidents related to time optimization in China have been frequent, largely because the relationships between time compression, construction costs, the quality of the project, and maintenance costs are neglected in the process [5,6]. For example, the third Qiantang River Bridge was completed ahead of schedule leading to expensive repairs and a collapse in 2011.…”
Section: Introductionmentioning
confidence: 99%
“…Uncertainties and particular requirements by the owner can cause the construction period of the project to change. In recent years, construction accidents related to time optimization in China have been frequent, largely because the relationships between time compression, construction costs, the quality of the project, and maintenance costs are neglected in the process [5,6]. For example, the third Qiantang River Bridge was completed ahead of schedule leading to expensive repairs and a collapse in 2011.…”
Section: Introductionmentioning
confidence: 99%
“…Therefore, the subject's behavior and decision making will show diverse characteristics. For different scenarios in the project construction phase, such as schedule control [69], cost control, operating environment conditions, and policy environment, the adaptability of the subject's behavior may lead to different behaviors, resulting in multiple manifestations of unsafe behavior [70], like incorrectly using safety protection supplies, violating the regulations, and paying little attention to protecting oneself and other people.…”
Section: Author Indicatorsmentioning
confidence: 99%
“…where the constraints given by (18) and (19) define the feasible region S ∈ ℝ n and the vector of decision variables x = x 1 , x 2 , … , x n belongs to S. The above objective values involve k conflicting functions f i ℝ n → ℝ that we want to minimize simultaneously.…”
Section: M2 Minmentioning
confidence: 99%
“…Afshar-Nadjafi [17] investigated the multimode project scheduling problem under the condition of decision making of recruitment and release for resources. Tao et al [18] investigated coupling project scheduling and resource flow allocation in repetitive projects considering site location and workspace congestion. Dong et al [19] took the feature of flexible resource renting and leasing into project scheduling problem.…”
Section: Construction Scheduling and Resource Allocationmentioning
confidence: 99%