2018
DOI: 10.1088/1755-1315/179/1/012039
|View full text |Cite
|
Sign up to set email alerts
|

Spatial and temporal distribution of nitrate concentration in Ciliwung River, Bogor City

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1

Citation Types

0
1
0
2

Year Published

2020
2020
2024
2024

Publication Types

Select...
4

Relationship

0
4

Authors

Journals

citations
Cited by 4 publications
(3 citation statements)
references
References 12 publications
0
1
0
2
Order By: Relevance
“…In addition, Sutrisno et al stated that an increase in global temperature encourages an increase in rainfall in a certain region and time. Increased rainfall is a driving force for flood disasters [12]. Umar et al and Hoch et al stated that the area that is very dangerous when the intensity of rainfall is high is the area of the fluvial formation process (alluvial fans, natural embankments, river meanders).…”
Section: Resultsmentioning
confidence: 99%
“…In addition, Sutrisno et al stated that an increase in global temperature encourages an increase in rainfall in a certain region and time. Increased rainfall is a driving force for flood disasters [12]. Umar et al and Hoch et al stated that the area that is very dangerous when the intensity of rainfall is high is the area of the fluvial formation process (alluvial fans, natural embankments, river meanders).…”
Section: Resultsmentioning
confidence: 99%
“…Namun, dalam beberapa abad terakhir, pemanfaatan sumber daya alam telah berubah secara dramatis. Revolusi industri dan pertumbuhan populasi manusia yang cepat telah meningkatkan permintaan akan sumber daya alam secara eksponensial (Sutrisno et al, 2020). Peningkatan konsumsi sumber daya alam telah membawa dampak serius pada lingkungan (Putri dan Citra, 2018).…”
Section: Pendahuluanunclassified
“…Daerah Aliran Sungai (DAS) Ciliwung meliputi 347 km 2 dengan panjang sungai 117 km (BPLHD DKI Jakarta, 2014;Sutrisno et al, 2018). Penelitian ini dilakukan pada segmen Kota Bogor dengan panjang sungai 14.5 km dengan waktu pelaksanaan dari Juni 2017 sampai Desember 2017.…”
Section: Lokasi Dan Waktu Penelitianunclassified