Stability Analysis of Rock Structure in Large Slopes and Open-Pit Mine: Numerical and Experimental Fault Modeling

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
9
0

Year Published

2020
2020
2024
2024

Publication Types

Select...
8
2

Relationship

0
10

Authors

Journals

citations
Cited by 44 publications
(10 citation statements)
references
References 25 publications
0
9
0
Order By: Relevance
“…The shell structural unit and cable structural unit were adopted in the initial lining and the anchor, respectively adopts, the locking foot anchor pipe adopts pile structural unit, and the excavation process is realized by giving empty unit (null). [11][12] According to the ground investigation report combined with relevant specifications, the main mechanical parameters were obtained as shown in Table 1.…”
Section: Building the Modelmentioning
confidence: 99%
“…The shell structural unit and cable structural unit were adopted in the initial lining and the anchor, respectively adopts, the locking foot anchor pipe adopts pile structural unit, and the excavation process is realized by giving empty unit (null). [11][12] According to the ground investigation report combined with relevant specifications, the main mechanical parameters were obtained as shown in Table 1.…”
Section: Building the Modelmentioning
confidence: 99%
“…The quadrilateral element was used to generate the grid, and considering the actual differences in the fragmentation and water-richness of different units of slope rock mass, the grid element was not equidistant, but the grid of IV and V-level units was encrypted to improve the transmission efficiency of node parameters, and the encryption ratio was 1:1.3 [8]. Assuming that the rock mass was a homogeneous elastic-plastic body, the Mohr-Coulomb stress criterion was obeyed [9]. Without setting a fixed number of iterations, the software calculates itself according to the principle that the stress distribution reaches equilibrium [10].…”
Section: Grid Model Establishmentmentioning
confidence: 99%
“…In order to ensure that open pit mining can be carried out safely and smoothly, the prediction and analysis of the stability of the open slope of the mining site is becoming more and more important. With the rapid development of computer science, numerical simulation analysis has become the main tool to study these kinds of engineering problems [5][6][7][8][9][10][11]. Software that fuses strength theory and numerical simulation can quickly and effectively simulate changes in slope stresses.…”
Section: Introductionmentioning