2021
DOI: 10.1108/sasbe-11-2020-0169
|View full text |Cite
|
Sign up to set email alerts
|

Stakeholder relationships in off-site construction: a systematic literature review

Abstract: PurposeThis paper aims to report a comprehensive analysis of literature on stakeholder relationships towards identifying patterns of relationships within the off-site construction context.Design/methodology/approachKey scholarly databases were accessed and after a filtering process, 74 relevant papers were retrieved for analysis. The papers were analysed using qualitative content analysis and scientometric techniques through the application of software Leximancer and VOSviewer.FindingsResearch synthesis method… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

1
13
0
1

Year Published

2021
2021
2023
2023

Publication Types

Select...
7
1

Relationship

0
8

Authors

Journals

citations
Cited by 28 publications
(15 citation statements)
references
References 104 publications
1
13
0
1
Order By: Relevance
“…This policy is helpful for the Just in Time implementation during CI application [ 120 ] and reduces inventory levels. The supply-chain policy of a company is distinctly critical [ 121 ]. To avoid prefabricated components production deferrals, the related manufacturers should be in reasonable control of the production line and the supply chain to manage inventories.…”
Section: Findings and Discussionmentioning
confidence: 99%
“…This policy is helpful for the Just in Time implementation during CI application [ 120 ] and reduces inventory levels. The supply-chain policy of a company is distinctly critical [ 121 ]. To avoid prefabricated components production deferrals, the related manufacturers should be in reasonable control of the production line and the supply chain to manage inventories.…”
Section: Findings and Discussionmentioning
confidence: 99%
“…The result in Figure 5 is the output of the degree of collaboration and interaction established in the network relation-ships among the SCM (see Figures 6-9). The results show that projects with strong SCM and network relationships have achieved better DCE (Nguyen et al, 2021;Xue et al, 2018b). In addition, projects having effectively established SCM saves time and cost by maximizing the product and delivery capacity of the actors involved (Xue et al, 2018a;Yu et al, 2019).…”
Section: Relationships Between Scm and Dcementioning
confidence: 93%
“…Furthermore, as of the instrumental stakeholder theory, establishing organizational structures for stakeholders' network relationships helps to improve the performance of DCE. However, a few papers focus on issues related to the industrialized building (Hu et al, 2019;Nguyen et al, 2021;Teng et al, 2017;Xue et al, 2018b). Still, a comprehensive review does not yet exist regarding the intersection of DCE, network relationships, and SCM with an industrialized building.…”
Section: Summary and Hypothesismentioning
confidence: 99%
“…For example, Shi et al (2015) analyzed the coopertion problems between major modularized production suppliers. Nguyen et al (2021) reviewed the stakeholder relationships in off-site construction via a systematic literature analysis. Yan et al (2017) designed suppliers' incentive mechanism by applying a principal-agent/Stackelberg model.…”
Section: Influencing Factors For the Development Of Prefabricated Con...mentioning
confidence: 99%