Starting up a 5-Stage Bardenpho Plant with In-Line Fermentation - One Step at a Time

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2014
2014
2019
2019

Publication Types

Select...
4

Relationship

1
3

Authors

Journals

citations
Cited by 4 publications
(2 citation statements)
references
References 0 publications
0
2
0
Order By: Relevance
“…This process diverts 5-15% of the anaerobic mixed liquor to a sidestream reactor with an HRT of 5-15 hours with the effluent being sent back to the anoxic zone of the mainstream. This process is in use at the Cedar Creek facility in Olathe, Kansas (Kobylinski et al, 2013). Lastly, Figure 2.2f shows an unmixed in-line MLSS fermentation configuration where a portion of the anaerobic zone in the mainstream process reduces mixing or completely stops mixing to allow fermentation to occur in the reactor.…”
Section: )mentioning
confidence: 99%
“…This process diverts 5-15% of the anaerobic mixed liquor to a sidestream reactor with an HRT of 5-15 hours with the effluent being sent back to the anoxic zone of the mainstream. This process is in use at the Cedar Creek facility in Olathe, Kansas (Kobylinski et al, 2013). Lastly, Figure 2.2f shows an unmixed in-line MLSS fermentation configuration where a portion of the anaerobic zone in the mainstream process reduces mixing or completely stops mixing to allow fermentation to occur in the reactor.…”
Section: )mentioning
confidence: 99%
“…The first purpose-built MLF in the world was utilized at the Cedar Creek Wastewater Treatment Plant (CCWTP) in Olathe KS (Kobylinski, 2013). Ongoing operational activities, biological process modelling, and bench scale testing at CCWTP are being used to better predict the VFA production capacity of the MLF.…”
Section: Mixed Liquor Fermentationmentioning
confidence: 99%