2010 Conference Proceedings IPEC 2010
DOI: 10.1109/ipecon.2010.5697167
|View full text |Cite
|
Sign up to set email alerts
|

Statistical voltage quality evaluation of wind farm-connected grid network

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2011
2011
2016
2016

Publication Types

Select...
3
1

Relationship

0
4

Authors

Journals

citations
Cited by 4 publications
(1 citation statement)
references
References 8 publications
0
1
0
Order By: Relevance
“…Reactive power optimisation (RPO) is used to plan the best voltage profile of a grid in the presence of a series of physical and operating constraints, so as to produce the least real power losses or improve the voltage equality [13]. As growing numbers of wind generators are invested in grids, their uncertainty leads to frequent voltage fluctuation due to system reaction delay [4]. This results in voltage quality problems such as voltage beyond limits, increasing power losses and the production of inferior products.…”
Section: Introductionmentioning
confidence: 99%
“…Reactive power optimisation (RPO) is used to plan the best voltage profile of a grid in the presence of a series of physical and operating constraints, so as to produce the least real power losses or improve the voltage equality [13]. As growing numbers of wind generators are invested in grids, their uncertainty leads to frequent voltage fluctuation due to system reaction delay [4]. This results in voltage quality problems such as voltage beyond limits, increasing power losses and the production of inferior products.…”
Section: Introductionmentioning
confidence: 99%