2002
DOI: 10.1080/00207540110073000
|View full text |Cite
|
Sign up to set email alerts
|

Steel-making process scheduling using Lagrangian relaxation

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
4
1

Citation Types

0
87
0

Year Published

2008
2008
2024
2024

Publication Types

Select...
5
5

Relationship

1
9

Authors

Journals

citations
Cited by 196 publications
(87 citation statements)
references
References 18 publications
0
87
0
Order By: Relevance
“…HFSs have important applications in flexible manufacturing systems (FMS), such as electronics and furniture manufacturing, process industries such as chemical, textile, metallurgical, semiconductors, printed circuit board assembly lines, pharmaceutical, oil, food, automobile manufactures, steel making systems, etc. -see, e.g., Tang et al (2002), Jin et al (2002), Mathirajan & Sivakumar (2006) and Yaurima et al (2009)-. Therefore, HFS scheduling has attracted interest by scientific community, being reflected in literature contributions dealing with this particular problem; however the issue of lot processing in this type of shops has not gained sufficient attention.…”
Section: Particularities Of Hfs With Lot Processingmentioning
confidence: 99%
“…HFSs have important applications in flexible manufacturing systems (FMS), such as electronics and furniture manufacturing, process industries such as chemical, textile, metallurgical, semiconductors, printed circuit board assembly lines, pharmaceutical, oil, food, automobile manufactures, steel making systems, etc. -see, e.g., Tang et al (2002), Jin et al (2002), Mathirajan & Sivakumar (2006) and Yaurima et al (2009)-. Therefore, HFS scheduling has attracted interest by scientific community, being reflected in literature contributions dealing with this particular problem; however the issue of lot processing in this type of shops has not gained sufficient attention.…”
Section: Particularities Of Hfs With Lot Processingmentioning
confidence: 99%
“…In this process, we need to decide the sequence, the beginning time, as well as the molten steel machine and scheduling of the molten steel in the iron & steel production stages. It is very difficult to get a good performance solution in practice in iron & steel production [1]. Optimization of the scheduling SCC processes can reduce the energy consumption and improve the profit of the company, so many iron & steel companies have studied the SCC production process for continuous improvement.…”
Section: Introductionmentioning
confidence: 99%
“…Tang et al [10] proposed an SCC scheduling that eliminates machine conflicts, via a non-linear programming model. In another work, Tang et al [11] developed an integer-programming model and obtained the optimal solution by combining Lagrangian relaxation and a heuristic method. Pacciarelli and Pranzo [12] completed the SCC schedule by using a generalisation of the disjunctive graph of Roy and Sussman [13] and Beam search.…”
Section: Introductionmentioning
confidence: 99%