2016
DOI: 10.1016/j.ijepes.2016.04.024
|View full text |Cite
|
Sign up to set email alerts
|

Stochastic operational scheduling of distributed energy resources in a large scale virtual power plant

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
59
0
2

Year Published

2016
2016
2021
2021

Publication Types

Select...
8
1

Relationship

0
9

Authors

Journals

citations
Cited by 119 publications
(61 citation statements)
references
References 27 publications
0
59
0
2
Order By: Relevance
“…Apart from that, some DG technologies may decrease electric power system's capability to provide instantaneous power reserve to cater the demand load fluctuation. This could be due to uncertainty in energy source availability for wind and solar-based generations [79], and operational variability of CHP operation whereby decoupling between heat and electricity demands occurs [80]. Lastly, there are technical risks for DG investment, especially for those lacking technological maturity and commercial availability i.e.…”
Section: Technical Barriersmentioning
confidence: 99%
“…Apart from that, some DG technologies may decrease electric power system's capability to provide instantaneous power reserve to cater the demand load fluctuation. This could be due to uncertainty in energy source availability for wind and solar-based generations [79], and operational variability of CHP operation whereby decoupling between heat and electricity demands occurs [80]. Lastly, there are technical risks for DG investment, especially for those lacking technological maturity and commercial availability i.e.…”
Section: Technical Barriersmentioning
confidence: 99%
“…Therefore, a multi-objective scheduling M A N U S C R I P T A C C E P T E D ACCEPTED MANUSCRIPT optimisation method has been developed which includes reducing electricity consumption and environmental impact of different systems (Liu et al, 2015). Using this approach Zamani et al (2016) analysed the simultaneous energy and reserve scheduling method for a Virtual Power Plant considering demand response resources, energy storages and uncertainties parameters. The study showed that modelling of uncertainties in operational planning problems makes the scheduled result more realistic.…”
Section: Accepted Manuscriptmentioning
confidence: 99%
“…In [60], energy and ancillary services is offered to solve the joint management for the following day in view of minimizing the VPP total operation costs. In [61], a probabilistic model is proposed and investigated for optimal day ahead scheduling of electrical and thermal energy resources in a VPP by simultaneously scheduling the energy and reserve in the presence of energy storage devices and demand response resources.…”
Section: Operation Systems Of Vppmentioning
confidence: 99%