2018
DOI: 10.1080/00207543.2018.1556408
|View full text |Cite
|
Sign up to set email alerts
|

Strategic process planning for commissioning processes in mechanical engineering

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1

Citation Types

0
5
0

Year Published

2019
2019
2024
2024

Publication Types

Select...
4
2

Relationship

0
6

Authors

Journals

citations
Cited by 6 publications
(5 citation statements)
references
References 25 publications
0
5
0
Order By: Relevance
“…Planning and control techniques 24 (Adrodegari et al, 2015;Ahmadian et al, 2016;Alfieri et al, 2011;Bortolini et al, 2019;Carvalho et al, 2017Carvalho et al, , 2016Carvalho et al, , 2015Dal Borgo and Meneghetti, 2019;Ghiyasinasab et al, 2020;Grabenstetter and Usher, 2014Jiang and Xi, 2019;Kim et al, 2020;Medini, 2015;Mourtzis et al, 2016;Nam et al, 2018;Pacagnella et al, 2019;Poeschl et al, 2019;Riezebos, 2010;Sjøbakk et al, 2015;Telles et al, 2019;Wesz et al, 2018;Yang, 2013) 7 (Bataglin et al, 2020;Cannas et al, 2018;Dallasega et al, 2018;Gejo García et al, 2020;Mahmood et al, 2018;Villar-Fidalgo et al, 2019) 31 Uncertainty/risk management 2012; Reid et al, 2019;Shen et al, 2011;Shurrab et al, 2020aShurrab et al, , 2020bSylla et al, 2020) Industry 4.0 10 ( Dallasega, 2018;Fox and Do, 2013;Kozjek et al, 2020;Oettmeier and Hofmann, 2016;…”
Section: Configuration Of Supply Chain Structurementioning
confidence: 99%
See 2 more Smart Citations
“…Planning and control techniques 24 (Adrodegari et al, 2015;Ahmadian et al, 2016;Alfieri et al, 2011;Bortolini et al, 2019;Carvalho et al, 2017Carvalho et al, , 2016Carvalho et al, , 2015Dal Borgo and Meneghetti, 2019;Ghiyasinasab et al, 2020;Grabenstetter and Usher, 2014Jiang and Xi, 2019;Kim et al, 2020;Medini, 2015;Mourtzis et al, 2016;Nam et al, 2018;Pacagnella et al, 2019;Poeschl et al, 2019;Riezebos, 2010;Sjøbakk et al, 2015;Telles et al, 2019;Wesz et al, 2018;Yang, 2013) 7 (Bataglin et al, 2020;Cannas et al, 2018;Dallasega et al, 2018;Gejo García et al, 2020;Mahmood et al, 2018;Villar-Fidalgo et al, 2019) 31 Uncertainty/risk management 2012; Reid et al, 2019;Shen et al, 2011;Shurrab et al, 2020aShurrab et al, , 2020bSylla et al, 2020) Industry 4.0 10 ( Dallasega, 2018;Fox and Do, 2013;Kozjek et al, 2020;Oettmeier and Hofmann, 2016;…”
Section: Configuration Of Supply Chain Structurementioning
confidence: 99%
“…Evidence is presented to show that process times can be reduced via planning and control techniques. For example, transport times can be reduced by offsite approaches (Ahmadian et al, 2016), and commissioning process can be reduced by as much as 40% (Poeschl et al, 2019). Work in progress can also be reduced (Bortolini et al, 2019).…”
Section: Planning and Control Techniquesmentioning
confidence: 99%
See 1 more Smart Citation
“…After analysis, the results are obtained, and then the corresponding weight value is selected according to the actual situation to calculate the comprehensive score, and the ranking level. Finally, according to the score ranking level, we can judge the ability that the person needs to have in the future work, so as to lay the foundation for making the next development plan [17][18].…”
Section: Employ Abilitymentioning
confidence: 99%
“…The developed complex heuristic optimization through use of a discrete bat algorithms with krill herd-based methodology. • Also in this topic area, Poeschl, Wirth, and Bauernhansl (2019) provided a methodology to optimize risks in the commissioning process. This was an application in mechanical engineering, specifically focused on machine production planning.…”
mentioning
confidence: 99%