All Days 2012
DOI: 10.2118/160845-ms
|View full text |Cite
|
Sign up to set email alerts
|

Stuck Pipe Best Practices – A Challenging Approach to Reducing Stuck Pipe Costs

Abstract: TX 75083-3836, U.S.A., fax 01-972-952-9435. AbstractStuck pipe incidents are one of the major operational challenges of the E&P industry and events usually lead to significant amount of lost time and associated costs. Various industry estimates claim that stuck pipe costs may exceed several hundred million US dollars per year. In Saudi Aramco, the recent increase in drilling activity, drilling in depleted and higher-risk reservoirs have led to an increased risk of stuck pipe. In 2010 Saudi Aramco formed a task… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
8
0

Year Published

2018
2018
2024
2024

Publication Types

Select...
6
1

Relationship

0
7

Authors

Journals

citations
Cited by 47 publications
(8 citation statements)
references
References 4 publications
0
8
0
Order By: Relevance
“…Based on the prediction results for the stuck pipes for all the ANN models, the best model is identified as being the ANN model that uses a logistic activation function with the network structure [19,10,8,6,1]. The best ANN model achieved an accuracy of 88.89%, a sensitivity of 91.89% and a specificity of 86.36%.…”
Section: Discussionmentioning
confidence: 99%
See 3 more Smart Citations
“…Based on the prediction results for the stuck pipes for all the ANN models, the best model is identified as being the ANN model that uses a logistic activation function with the network structure [19,10,8,6,1]. The best ANN model achieved an accuracy of 88.89%, a sensitivity of 91.89% and a specificity of 86.36%.…”
Section: Discussionmentioning
confidence: 99%
“…On the other hand, model no. 580 has a network topology of [19,10,8,6,1]. The accuracy, sensitivity and specificity were 88.89%, 91.89% and 86.36%, respectively.…”
Section: Figurementioning
confidence: 99%
See 2 more Smart Citations
“…In fact, stuck pipes account for about 25% of the nonproductive time. A third of the stuck pipes are due to differential pressure sticking (Muqeem et al 2012).…”
Section: Differential Pressure Stickingmentioning
confidence: 99%