Studi Implementasi Model House of Risk (HOR) Untuk Mitigasi Risiko Keterlambatan Material Dan Komponen Impor Pada Pembangunan Kapal Baru

Abstract: Galangan kapal dituntut menyelesaikan pembangunan kapal sesuai dengan kontrak. Ketepatan penyelesaian berhubungan dengan ketepatan pengadaan material dan komponen. Pada penelitian ini, digunakan model HOR untuk mengidentifikasi variabel risiko (risk event dan risk agent) dan mitigasi risiko. HOR digunakan pada proses bisnis umum pengadaan dan proses bisnis pengadaan setiap material dan komponen impor kategori high risk. HOR dibagi menjadi 2 fase: pertama yaitu identifikasi risiko untuk menghasilkan prioritas r… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1

Citation Types

0
6
0
4

Year Published

2020
2020
2023
2023

Publication Types

Select...
8

Relationship

0
8

Authors

Journals

citations
Cited by 11 publications
(10 citation statements)
references
References 0 publications
0
6
0
4
Order By: Relevance
“…In House of Risk method, a risk agent that has a high ARP (Aggregate Risk Potential) is selected, which means that the risk agent has a high probability of events and causes many risk events with severe impacts. Then, mitigation actions are prepared for selected risk agents based on the ratio of total effectiveness for the level of difficulty and mitigation actions that can reduce many risk agents with high ARP values (Cahyani, Pribadi, & Baihaqi, 2016). Brainstorming with the company is carried out to examine risky events that occur.…”
Section: N P R E S Smentioning
confidence: 99%
“…In House of Risk method, a risk agent that has a high ARP (Aggregate Risk Potential) is selected, which means that the risk agent has a high probability of events and causes many risk events with severe impacts. Then, mitigation actions are prepared for selected risk agents based on the ratio of total effectiveness for the level of difficulty and mitigation actions that can reduce many risk agents with high ARP values (Cahyani, Pribadi, & Baihaqi, 2016). Brainstorming with the company is carried out to examine risky events that occur.…”
Section: N P R E S Smentioning
confidence: 99%
“…HOR 1 is used to identify risks and determine priority risk agents to be mitigated. Risk agents who have high Aggregate Risk Potentials (ARP) are selected in HOR because the risk agent has a high probability of occurrence that causes many risk events with severe impacts (Cahyani, Pribadi, & Baihaqi, 2016). HOR 2 aims to prioritize treatment strategies based on their level of effectiveness.…”
Section: Introductionmentioning
confidence: 99%
“…For example, SMEs that produce Salak Fruit have faced risk events such as damage or deterioration in quality, damage during storage, decrease production, run out of supplies, changes in the number of orders, product returns, delays in processing, damage in handling, and contamination during processing (Risqiyah & Santoso, 2017). Likewise, large industries have to deal with risk events such as those occurring in the shipyard industry (Cahyani et al, 2016) Therefore, currently, industry players need to be aware of the importance of implementing supply chain risk management to survive in a risky environment. Ulfah et al (2016) argue that supply chain risk management is important in keeping the supply chain system uninterrupted because it never knows what will happen in the future.…”
Section: Introductionmentioning
confidence: 99%