2013
DOI: 10.4028/www.scientific.net/amr.838-841.1405
|View full text |Cite
|
Sign up to set email alerts
|

Study of Construction Method on Sole-Hole Double Deck Tunnel

Abstract: 2D elasto-plastic finite element method was adopted to analyze the forced state of the surrounding rock and the tunnel lining in every step of the construction project for Fulongping double-decked tunnel. In the analysis,Mohr-Coulombs yield criterion was employed incoporating associated flow law to account for the elasto-plastic characteristics of materials. The tangent stiffness method was adopted to solve the equation of equilibrium, and the stresses which exceeded yielded point were adjusted.

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Publication Types

Select...

Relationship

0
0

Authors

Journals

citations
Cited by 0 publications
references
References 1 publication
0
0
0
Order By: Relevance

No citations

Set email alert for when this publication receives citations?