2020
DOI: 10.1155/2020/4909750
|View full text |Cite
|
Sign up to set email alerts
|

Study of the Construction Sequence of Overlapping Tunnels by the Shield Tunneling Method: A Case Study of the Longest Overlapping Tunnel in China

Abstract: In this study, the reasonable construction sequence of an overlapping tunnel shield is investigated. Taking the overlapping tunnel of Tianjin Metro Line 5 as the background, a three-dimensional numerical model was established using Flac3D software to study the influence of the “first up and then down” and “first down and then up” construction sequences of the overlapping tunnel on the surface settlement, stratum displacement, lining radial stress, and displacement. The research results show that the shape and … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2021
2021
2024
2024

Publication Types

Select...
3

Relationship

0
3

Authors

Journals

citations
Cited by 3 publications
(1 citation statement)
references
References 11 publications
0
1
0
Order By: Relevance
“…Pan et al [8] carried out the safety and stability analysis of shield tunnel under the existing subway. Yang et al [9] studied the effect of Double Line Shield tunnel construction technology on the frame structure. Guan et al [10] analyzed the influence factors of the double-track tunnel passing through the existing track line in a short distance.…”
Section: Introductionmentioning
confidence: 99%
“…Pan et al [8] carried out the safety and stability analysis of shield tunnel under the existing subway. Yang et al [9] studied the effect of Double Line Shield tunnel construction technology on the frame structure. Guan et al [10] analyzed the influence factors of the double-track tunnel passing through the existing track line in a short distance.…”
Section: Introductionmentioning
confidence: 99%