2015 18th International Conference on Electrical Machines and Systems (ICEMS) 2015
DOI: 10.1109/icems.2015.7385067
|View full text |Cite
|
Sign up to set email alerts
|

Study on black start strategy of microgrid with PV and multiple energy storage systems

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1

Citation Types

0
16
0

Year Published

2017
2017
2024
2024

Publication Types

Select...
5
3
1

Relationship

0
9

Authors

Journals

citations
Cited by 25 publications
(16 citation statements)
references
References 4 publications
0
16
0
Order By: Relevance
“…In this sense, the voltage support and harmonic compensation are applied to the BESS so as to improve aspects of energy quality [4,68]; Black Start Capability: Several studies propose the use of BESS to promote the recovery of a total or partial electrical grid subjected to a blackout. Under such conditions, the assistance given by BESS impacts the time of grid interruption and the economic losses [69].…”
Section: Services Performed By Bessmentioning
confidence: 99%
“…In this sense, the voltage support and harmonic compensation are applied to the BESS so as to improve aspects of energy quality [4,68]; Black Start Capability: Several studies propose the use of BESS to promote the recovery of a total or partial electrical grid subjected to a blackout. Under such conditions, the assistance given by BESS impacts the time of grid interruption and the economic losses [69].…”
Section: Services Performed By Bessmentioning
confidence: 99%
“…The success of the black start mainly relies on the installation of storage devices, the operation of Microgrid Central Controller (MGCC) and Microsource Controller (MC), along with the mount of microsources with black start capability [27] [28]. The microsources can be classified into two types, Black-Start Distributed Generation (BSDG) and Nonblack-start Distributed Generation (NBDG) based on whether it possesses black start capability [28]. The BSDGs include gas turbines, hydro units, steam units, and DGs with storage devices like batteries and super-capacitors [29].…”
Section: B Black Start Capabilitymentioning
confidence: 99%
“…batteries and supercapacitors) and is managed by MGCC. In [28], an effective black start strategy for microgrid with PV and hybrid energy storage systems based on a serial restoration approach was illustrated, where the lithium storage system was chosen to perform as the main power supply, and the Vanadium Redox Flow Battery (VRB) system was chosen to perform as BSDG. In [32], the hydro power plant was found that it has the least black start power requirement which its start-up power is only 0.5-1.0% of its generation rating, hence it was chosen to serve as the BSDG installed near the thermal units in a proposed strategy so as to reduce the restoration time.…”
Section: B Black Start Capabilitymentioning
confidence: 99%
“…The number of all the shortest paths via each node in the network is calculated through the Betweenness-Centrality algorithm and the betweenness of each node is finally determined. The importance of nodal load is calculated by Equation (11). Finally, the importance degree of each node is calculated by Equation (12).…”
Section: Parallel Restoration Strategy For Microgrid Reconfigurationmentioning
confidence: 99%