“…A series of studies have been conducted on the load transfer mechanism and the settlement characteristics of the piled embankment system, including analytical solutions (e.g., Hewlett and Randolph [13], Zhang [14], Van Eekelen [15], Zhuang [16], Nguyen [17]), numerical simulations (e.g., Indraratna [18], Liu and Rowe [19], Wang [20]) and field investigations (e.g., Liu [21], Nunez [22], Zhao [23]). Furthermore, the dynamic response of the piled embankment system under highway and high-speed train load have been investigated over recent years (e.g., Zhuang [24], Chango [25], Chen [26]).…”