2007
DOI: 10.1016/s1570-6672(07)60034-8
|View full text |Cite
|
Sign up to set email alerts
|

Summary of the Application Effect of Bus Rapid Transit at Beijing South-Centre Corridor of China

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1

Citation Types

0
15
0

Year Published

2007
2007
2022
2022

Publication Types

Select...
5
1

Relationship

0
6

Authors

Journals

citations
Cited by 18 publications
(15 citation statements)
references
References 0 publications
0
15
0
Order By: Relevance
“…The metropolis is governed as a direct-controlled municipality under the national government, with 14 urban and suburban districts and 2 rural counties. Beijing Southern Axis BRT Line 1 (BRT1) is the first BRT system implemented in China and the first large-capacity rapid bus line based on the needs of developing public transportation, which was designed using foreign advanced ideas and technology as reference (Lin and Wu 2007). BRT1 started commercial operations in December 2004 with a pilot line of only 5.5 km in length.…”
Section: Brt1 Beijing Chinamentioning
confidence: 99%
See 3 more Smart Citations
“…The metropolis is governed as a direct-controlled municipality under the national government, with 14 urban and suburban districts and 2 rural counties. Beijing Southern Axis BRT Line 1 (BRT1) is the first BRT system implemented in China and the first large-capacity rapid bus line based on the needs of developing public transportation, which was designed using foreign advanced ideas and technology as reference (Lin and Wu 2007). BRT1 started commercial operations in December 2004 with a pilot line of only 5.5 km in length.…”
Section: Brt1 Beijing Chinamentioning
confidence: 99%
“…The investment in the road reconstruction project was about 321.31 million yuan, and the investment for the stations and ITS (including operation for stations, parking lots, vehicles, etc.) was approximately 288.19 million yuan, for a total cost of 609.5 million yuan; construction cost per kilometer was about 38.1 million yuan (Lin and Wu 2007), a cost in American dollars (in 2014 values) of approximately $6.2 million.…”
Section: Brt1 Beijing Chinamentioning
confidence: 99%
See 2 more Smart Citations
“…Such connections and the interactions involved could be studied from different perspectives. In fact, BRT systems have been approached from an institutional perspective (Lámbarry Vilchis et al, 2011Vilchis et al, , 2010Ponnaluri, 2011), a social perspective (Cahill Delmelle and Casas, 2012;Lin and Wu, 2007), an economic perspective (Cervero and Kang, 2011;Hensher and Golob, 2008;Lindau et al , 2008), an urban planning perspective (Ardila-Gómez, 2004), a technical perspective (Hensher and Golob, 2008;, and an environmental perspective (Nugroho et al, 2010;Wöhrnschimmel et al, 2008).…”
Section: Bus Rapid Transit (Brt): Previous Studies Contribution and mentioning
confidence: 99%