2018
DOI: 10.1063/1.5033680
|View full text |Cite
|
Sign up to set email alerts
|

Summary on reliability analysis of distributed power access on distribution network

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2022
2022
2022
2022

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 1 publication
0
1
0
Order By: Relevance
“…Rahman et al [3] of MIT applied the fault tree analysis method in the risk assessment of nuclear power plants and listed all the causes of nuclear power plant failures in 1974. Yang et al [4] proposed a diagnosis method that combined the fault tree analysis with an expert system to develop a fault diagnosis expert system to meet the fault diagnosis function of the DC charging pile. Lanza et al [5] analyzed the reliability of feedback fault information to establish the machine-tool fault diagnosis and prediction system.…”
Section: Introductionmentioning
confidence: 99%
“…Rahman et al [3] of MIT applied the fault tree analysis method in the risk assessment of nuclear power plants and listed all the causes of nuclear power plant failures in 1974. Yang et al [4] proposed a diagnosis method that combined the fault tree analysis with an expert system to develop a fault diagnosis expert system to meet the fault diagnosis function of the DC charging pile. Lanza et al [5] analyzed the reliability of feedback fault information to establish the machine-tool fault diagnosis and prediction system.…”
Section: Introductionmentioning
confidence: 99%