2012
DOI: 10.1016/j.cities.2010.12.003
|View full text |Cite
|
Sign up to set email alerts
|

Sunderland

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

1
2
0

Year Published

2013
2013
2022
2022

Publication Types

Select...
5

Relationship

0
5

Authors

Journals

citations
Cited by 7 publications
(3 citation statements)
references
References 5 publications
1
2
0
Order By: Relevance
“…This acted as a catalyst towards the broader objectives of brownfield regeneration of the HVP area for an economically sustainable and socially vibrant future (Le Feuvre, 2011). HVP is therefore similar to many other urban redevelopment and regeneration initiatives found in the former industrial sites of UK cities, some of which have been examined in this journal(Couch & Dennemann, 2000;Short & Tetlow, 2012).The partnership's areal remit lies within the Greater Manchester conurbation (population 2.7 million in 2014), and is situated in the Reddish district between the City of Manchester itself and Stockport Metropolitan Borough (one of the 10 local authorities that make up the Greater Manchester city-region), approximately seven miles to the south east of Manchester city centre. Figure 1 indicates the locational context and spatial extent of the study area.…”
supporting
confidence: 56%
“…This acted as a catalyst towards the broader objectives of brownfield regeneration of the HVP area for an economically sustainable and socially vibrant future (Le Feuvre, 2011). HVP is therefore similar to many other urban redevelopment and regeneration initiatives found in the former industrial sites of UK cities, some of which have been examined in this journal(Couch & Dennemann, 2000;Short & Tetlow, 2012).The partnership's areal remit lies within the Greater Manchester conurbation (population 2.7 million in 2014), and is situated in the Reddish district between the City of Manchester itself and Stockport Metropolitan Borough (one of the 10 local authorities that make up the Greater Manchester city-region), approximately seven miles to the south east of Manchester city centre. Figure 1 indicates the locational context and spatial extent of the study area.…”
supporting
confidence: 56%
“…Despite efforts at regeneration, the city's economic and social development indices continue to lag many other post-industrial cities (Short & Tetlow, 2012) in the UK. However, the people of Sunderland have developed a strong sense of identity and through symbols such as their soccer team they construct meaning and "express their attachment and sense of belonging to the community" (Burbano-Elizondo, 2006, p. 114).…”
Section: Methodsmentioning
confidence: 99%
“…As a consequence, Sunderland witnessed higher than national average figures of unemployment and experienced a period of significant economic decline. Regeneration activities have sought to address the legacy of the loss of traditional heavy industry on the economic, social and cultural fabric of the city (Short & Fundingsland Tetlow 2011). As part of this agenda, it is possible to trace from about 1996 the beginning of ICT-related activities as a major strand.…”
Section: Introductionmentioning
confidence: 99%