Synchrophasor measurement applications and optimal PMU placement: A review

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
26
0
2

Year Published

2022
2022
2024
2024

Publication Types

Select...
9
1

Relationship

0
10

Authors

Journals

citations
Cited by 46 publications
(28 citation statements)
references
References 111 publications
0
26
0
2
Order By: Relevance
“…Hence, high transmission delays and low precision are typical characteristics of SCADA [69], [70]. In terms of control, the update period of SCADA limits its application for fast and complex control actions, especially during contingencies [72], since real-time dynamics cannot be observed.…”
Section: B Measurement and Communication Systemsmentioning
confidence: 99%
“…Hence, high transmission delays and low precision are typical characteristics of SCADA [69], [70]. In terms of control, the update period of SCADA limits its application for fast and complex control actions, especially during contingencies [72], since real-time dynamics cannot be observed.…”
Section: B Measurement and Communication Systemsmentioning
confidence: 99%
“…Among the consequences of the oscillations is the disconnection of the electric lines connecting two areas or more, so each area must increase the production of electric energy in order to balance between production and consumption of electric energy which also increases the carbon dioxide emissions. The objective of our research is to improve the interconnections between regions in order to increase the availability of electrical energy across several areas In order to improve the interconnection oscillations, we proposed the use of phasor measurement unit PMU technology for synchronization and taking real-time measurements [7], and an interconnection control system for the closure of interconnection lines in the case of increased demand to energy consumption, with this solution we avoid the rate of operation of power plants so the use of fossil energy is also reduced by improving interarea oscillation.…”
Section: Introductionmentioning
confidence: 99%
“…The majority of these papers utilize a set of equations and redundant measurements obtained from state equations to obtain the parameters [4,5]. However, with the advent of phasor measurement units (PMUs), new methodologies for real-time applications have been developed, as the reporting rate of these devices is significantly higher compared to common Supervisory Control and Data Acquisition (SCADA) systems [6].…”
Section: Introductionmentioning
confidence: 99%