2018
DOI: 10.1063/1.5038962
|View full text |Cite
|
Sign up to set email alerts
|

System level design of the ITER bolometer port plug cameras

Abstract: The ITER bolometer diagnostic is planned to have 550 lines of sight (LOS) distributed all over the vessel. 240 channels are provided by cameras mounted in two Upper Ports and in one Equatorial Port. This paper describes the current status of the system level design of the port cameras and the solutions proposed on how to implement all required camera components while meeting a multitude of competing requirements. Sensor holders, support structures and different apertures depending on the camera type (pinhole o… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2021
2021
2023
2023

Publication Types

Select...
3

Relationship

1
2

Authors

Journals

citations
Cited by 3 publications
(1 citation statement)
references
References 5 publications
0
1
0
Order By: Relevance
“…22 cameras are mounted directly to the Vacuum Vessel (VV) surface distributed on six different sectors (S01, S03, S04, S06, S08, S09) of ITER. The design principle of these different cameras has been shown previously in several publications: VV cameras [2], PP cameras [3] and divertor cameras [4]. This paper will present the final design of the first component of the ITER bolometer diagnostic of the VV cameras, the cable installation template (CIT) which is a First Plasma (FP) component.…”
Section: Introduction To the Iter Bolometers And The Need Of A Cable ...mentioning
confidence: 96%
“…22 cameras are mounted directly to the Vacuum Vessel (VV) surface distributed on six different sectors (S01, S03, S04, S06, S08, S09) of ITER. The design principle of these different cameras has been shown previously in several publications: VV cameras [2], PP cameras [3] and divertor cameras [4]. This paper will present the final design of the first component of the ITER bolometer diagnostic of the VV cameras, the cable installation template (CIT) which is a First Plasma (FP) component.…”
Section: Introduction To the Iter Bolometers And The Need Of A Cable ...mentioning
confidence: 96%