System Modeling and Risk Analysis of the Sichuan–Tibet Railway Project

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1

Citation Types

0
3
0

Year Published

2022
2022
2024
2024

Publication Types

Select...
4
1

Relationship

0
5

Authors

Journals

citations
Cited by 7 publications
(3 citation statements)
references
References 28 publications
0
3
0
Order By: Relevance
“…Additionally, the involvement of the operating unit in the project construction increases risks for the EPC general contractor. Linear engineering projects have multiple lines and vast geographical details to consider [8]. Unfortunately, it is often difficult to obtain accurate survey results during the feasibility stage of the project.…”
Section: Introductionmentioning
confidence: 99%
“…Additionally, the involvement of the operating unit in the project construction increases risks for the EPC general contractor. Linear engineering projects have multiple lines and vast geographical details to consider [8]. Unfortunately, it is often difficult to obtain accurate survey results during the feasibility stage of the project.…”
Section: Introductionmentioning
confidence: 99%
“…The essence of the construction engineering project risk is the difference between the manager's prediction of the future situation and the actual future situation. This difference can lead to the risk prevention plan not working as expected, resulting in the project failure [33]. There are two parts that comprise the human understanding of the object: the understanding of the object itself and the understanding of mental associations generated by the object [34].…”
Section: Methods To Improve the Accuracy Of Mcdm Methodsmentioning
confidence: 99%
“…As for the tunnel construction, it is proposed to adopt the construction program of a drilling and blasting method, so, taking the key construction links of the drilling and blasting method as an example, assume that the main construction process comprises the four links of advance support, excavation, initial support, and secondary masonry [59,60], which are represented by t 1 , t 2 , t 3 , and t 4 . To reduce the impact of the No.1 landslide on the excavation of Tunnel A and control the safety risk it generates, safety risk prevention and control measures need to be formulated for this purpose.…”
Section: Project Backgroundmentioning
confidence: 99%