2016
DOI: 10.1002/geot.201600037
|View full text |Cite
|
Sign up to set email alerts
|

TBM drives at the Gotthard Base Tunnel – Design and experience from tunnelling in Faido / TBM‐Vortriebe am Gotthard Basistunnel – Projektierung und Erfahrung aus dem Vortrieb Faido

Abstract: In the course of designing the Gotthard Base Tunnel, extensive questions were considered about the tunnelling conditions to be expected and the resulting requirements for the TBM. Naturally this mainly concentrated on the achievable advance rates and the associated costs. The tunnelling works have now been completed and the essential assumptions and decisions from the design phase could be confirmed. Experience does however also show that the behaviour of the rock mass could not always be correctly predicted i… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2023
2023
2023
2023

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 2 publications
0
1
0
Order By: Relevance
“…Prominent examples of these phenomena in the Alpine region include the Gotthard Base Tunnel, e. g., in the unfavourable bedding of the mica-rich Lucomagno gneisses [1][2][3], the Strenger Tunnel on the S16 Arlberg motorway, see Fig. 1 and 2 and refer to [4][5][6][7], and the Brenner Base Tunnel [8][9][10].…”
Section: Introductionmentioning
confidence: 99%
“…Prominent examples of these phenomena in the Alpine region include the Gotthard Base Tunnel, e. g., in the unfavourable bedding of the mica-rich Lucomagno gneisses [1][2][3], the Strenger Tunnel on the S16 Arlberg motorway, see Fig. 1 and 2 and refer to [4][5][6][7], and the Brenner Base Tunnel [8][9][10].…”
Section: Introductionmentioning
confidence: 99%