2017
DOI: 10.1016/j.fusengdes.2017.03.036
|View full text |Cite
|
Sign up to set email alerts
|

Technological assessment between vertical and horizontal remote maintenance schemes for DEMO reactor

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1

Citation Types

0
3
0

Year Published

2018
2018
2021
2021

Publication Types

Select...
5

Relationship

1
4

Authors

Journals

citations
Cited by 5 publications
(3 citation statements)
references
References 9 publications
0
3
0
Order By: Relevance
“…This technology is not yet proven, but if developed, would greatly facilitate the nuclear testing and breeding program, with the potential to change out walls and major components more rapidly. For instance, a vertical change out approach such as proposed in [52] may be attractive. With the high fields and compactness of this device, mechanical stresses from electromagnetic loads will be a critical issue, as maximum fields in the magnets, B max will reach levels ∼16-18 T for a 7 T device.…”
Section: Engineering Considerationsmentioning
confidence: 99%
“…This technology is not yet proven, but if developed, would greatly facilitate the nuclear testing and breeding program, with the potential to change out walls and major components more rapidly. For instance, a vertical change out approach such as proposed in [52] may be attractive. With the high fields and compactness of this device, mechanical stresses from electromagnetic loads will be a critical issue, as maximum fields in the magnets, B max will reach levels ∼16-18 T for a 7 T device.…”
Section: Engineering Considerationsmentioning
confidence: 99%
“…In the JA DEMO, a banana segment and divertor cassette maintenance scheme were selected as a result of considerations of a variety of RM concepts. [39][40][41][42] The tentative foreseen replacement frequency of BB segments and divertor cassettes is about 4 to 5 years and 1 to 2 years, respectively. Part of divertor heat sink is composed of Cualloy cooling pipe with tungsten monoblock armor.…”
Section: Remote Maintenancementioning
confidence: 99%
“…Therefore, the divertor units are replaced together with the 140 BB cartridges. This number is equivalent to the total number of the components that need periodical maintenance in the tokamak DEMO of 128, which consists of 80 blanket segments and 48 divertor cassettes [10,11]. The other BB cartridges of BB14 -BB16 can be replaced if necessary.…”
Section: Overview Of the Cardistry-b2mentioning
confidence: 99%