“…The samples were cured in the laboratory environment with a temperature of 20 ± 1 °C and a natural humidity of about 26% for 14, 28, and 60 days. In order to make the results applicable for the field projects, it is better to simulate the real field condition [ 58 , 59 , 60 , 61 , 62 , 63 , 64 , 65 , 66 , 67 , 68 , 69 ]. In other words, these specific curing times were selected in this research since foundations and structures are often built on lime-based concretes after two to eight weeks of concrete casting [ 21 ].…”