2017
DOI: 10.1016/j.fusengdes.2017.02.035
|View full text |Cite
|
Sign up to set email alerts
|

The 10 MW EPSM modulator and other key components for the KIT gyrotron test facility FULGOR

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
10
0

Year Published

2017
2017
2019
2019

Publication Types

Select...
6

Relationship

2
4

Authors

Journals

citations
Cited by 13 publications
(10 citation statements)
references
References 1 publication
0
10
0
Order By: Relevance
“…Instrumental to the gyrotron R&D is the new Fusion Long Pulse Gyrotron Lab (FULGOR) at KIT, a test stand capable of 10 MW DC CW operation [38]. The capabilities of the main high-voltage DC power supply, delivered in late 2017 by Ampegon AG (Turgi, Switzerland, www.ampegon.com), are up to 90 kV / 120 A for 3600 s and 120 kV / 120 A in short pulse.…”
Section: Infrastructurementioning
confidence: 99%
“…Instrumental to the gyrotron R&D is the new Fusion Long Pulse Gyrotron Lab (FULGOR) at KIT, a test stand capable of 10 MW DC CW operation [38]. The capabilities of the main high-voltage DC power supply, delivered in late 2017 by Ampegon AG (Turgi, Switzerland, www.ampegon.com), are up to 90 kV / 120 A for 3600 s and 120 kV / 120 A in short pulse.…”
Section: Infrastructurementioning
confidence: 99%
“…KIT is currently funding a significant extension of its existing gyrotron test stand. That new test stand named FULGOR will allow the test of gyrotrons with up to 2x2 MW RF output power with dual-beam output [25]. The installation of the main part, the 10 MW CW high voltage DC power supply (HVDCPS) has been completed in spring of 2018 by Ampegon, Turgi, Switzerland.…”
Section: Fulgormentioning
confidence: 99%
“…Vital to the future gyrotron R&D is the new Fusion Long Pulse Gyrotron Lab (FULGOR), a test stand able to support the development of up to 4 MW continuous wave gyrotrons at frequencies up to 240 GHz [9]. Within the EUROfusion project, the basic specification for a super-conducting 10.5 T cryogen-free magnet for FULGOR has been prepared.…”
Section: Status On the Kit Fusion Gyrotron Developmentsmentioning
confidence: 99%