2013
DOI: 10.1016/j.nima.2013.06.015
|View full text |Cite
|
Sign up to set email alerts
|

The 4K outer cryostat for the CUORE experiment: Construction and quality control

Abstract: The external shell of the CUORE cryostat is a large cryogen-free system designed to host the dilution refrigerator and the bolometers of the CUORE experiment in a low radioactivity environment. The three vessels that form the outer shell were produced and delivered to the Gran Sasso underground Laboratories in July 2012. In this paper, we describe the production techniques and the validation tests done at the production site in 2012.

Help me understand this report
View preprint versions

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1

Citation Types

0
6
0

Year Published

2014
2014
2020
2020

Publication Types

Select...
7
1

Relationship

6
2

Authors

Journals

citations
Cited by 14 publications
(6 citation statements)
references
References 13 publications
0
6
0
Order By: Relevance
“…The detector is housed in a state-of-the-art cryostat, which shields the detectors from both thermal and gamma radiation. Cooling at the 10 mK stage is achieved by a custom 3 He= 4 He dilution refrigerator [24,[37][38][39][40][41][42][43].…”
mentioning
confidence: 99%
“…The detector is housed in a state-of-the-art cryostat, which shields the detectors from both thermal and gamma radiation. Cooling at the 10 mK stage is achieved by a custom 3 He= 4 He dilution refrigerator [24,[37][38][39][40][41][42][43].…”
mentioning
confidence: 99%
“…The detector is housed in a state-of-the-art cryostat, which shields the detectors from both thermal and gamma radiation. Cooling at the 10 mK stage is achieved by a custom 3 He/ 4 He dilution refrigerator [24,[37][38][39][40][41][42][43].…”
mentioning
confidence: 99%
“…This is the same copper used to produce 4 A detailed description of the vessel production and machining can be found in Ref. [19], where special attention is paid to the description of the welding techniques employed to minimize radioactive contamination during welding.…”
Section: Methodsmentioning
confidence: 99%
“…The construction of the 4 K outer cryostat, i. e. the 300 K, 40 K and 4 K stages [19], proceeded roughly in parallel with the separate commissioning of the DU. The goal of the first cooldown run, Run 0, was to verify the outer cryostat, both in terms of vacuum tightness and cooling power of the PT system.…”
Section: Commissioningmentioning
confidence: 99%