The Causes Influencing the Occurrence of Variation Orders in the Construction of Buildings

Abstract: In the construction of buildings usually, problems occur because of the causes of change orders. The main causer of change orders is the owners, consultants, and contractors. These changes lead to conflicts among them which result in influencing building projects. Therefore, it is necessary to analyze the causes of change orders to reduce them and facilitate management. This paper determines the most critical factors that cause change orders from a different point of view, a consulting owner and a contractor, … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1

Citation Types

0
4
0

Year Published

2023
2023
2024
2024

Publication Types

Select...
4

Relationship

0
4

Authors

Journals

citations
Cited by 4 publications
(4 citation statements)
references
References 13 publications
0
4
0
Order By: Relevance
“…In terms of risk management and control of construction projects, most existing studies analyze the causes of engineering changes from the perspective of engineering construction stakeholders and evaluate the risks arising from engineering changes [12][13][14][15]. Changes in engineering and construction projects are caused by a variety of factors, the most influential of which is design change [16,17].…”
Section: Design Change Riskmentioning
confidence: 99%
See 1 more Smart Citation
“…In terms of risk management and control of construction projects, most existing studies analyze the causes of engineering changes from the perspective of engineering construction stakeholders and evaluate the risks arising from engineering changes [12][13][14][15]. Changes in engineering and construction projects are caused by a variety of factors, the most influential of which is design change [16,17].…”
Section: Design Change Riskmentioning
confidence: 99%
“…Based on a literature [13][14][15][16][17][18][19][20][21][22][23][24][25][26][27][28][29][30][31] search, this paper preliminarily identifies the influencing factors of prefabricated buildings that induce design change risks. Secondly, this paper uses a questionnaire survey to collect empirical data.…”
Section: Identification Of Factors That Induce Design Change Risks In...mentioning
confidence: 99%
“…The construction projects in Iraq are subjected to many problems which gives rise to the need to introduce the concept of constructability in the industry. The problems facing the industry are poor communication between the designer and builder (Khan 2019;Thirion 2019;Højbjerg et al 2021), increase in project complexity, clashes between the building's components (Yang et al 2013;Høqjbjerg et al 2021), difficulty in controlling project time and budget (Rashed and Mahjoob 2014;Ahmed and Altaie 2021;Qi et al 2022), and increased change orders and redesign in projects which lead to failed projects (Rezouki and Alhilli 2022). The essential responsibility of constructability is to convert plans and specifications into finished products (Khan 2019;Nolan and Gibson 2022).…”
Section: Introductionmentioning
confidence: 99%
“…Therefore, this emanates the need for the introduction of constructability in the construction industry as more management is required to achieve project objectives and maximize its efficiency by including all experience and construction knowledge in the early phases of engineering, planning, procurement, and field operations [3]. Also, the difficulty in controlling project time and budget [3,5], the increment in change orders, clashes between building components and redesign in projects [6]. According to [7,3] there are three main ways to assess, improve and develop constructability which are: constructability program implementation, review of constructability, and quantified assessment of the design.…”
Section: Introductionmentioning
confidence: 99%