2018
DOI: 10.1088/1755-1315/113/1/012090
|View full text |Cite
|
Sign up to set email alerts
|

The construction of power grid operation index system considering the risk of maintenance

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2024
2024
2024
2024

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 1 publication
0
1
0
Order By: Relevance
“…As a result, the Whale Optimization Algorithm (WOA) can be utilized to successfully propose emergency demand response strategies to ensure the stability of power system voltage operation [ 41 ]. Create a grid operation index system that takes maintenance risk into account to meet grid emergency dispatching work by combining qualitative and quantitative methodologies [ 42 ]. Finally, emergency rescue and restoration work is carried out through continuous and stable power to guarantee electricity for personnel in the emergency area.…”
Section: Elements Of An Emergency Rapid Response Systemmentioning
confidence: 99%
“…As a result, the Whale Optimization Algorithm (WOA) can be utilized to successfully propose emergency demand response strategies to ensure the stability of power system voltage operation [ 41 ]. Create a grid operation index system that takes maintenance risk into account to meet grid emergency dispatching work by combining qualitative and quantitative methodologies [ 42 ]. Finally, emergency rescue and restoration work is carried out through continuous and stable power to guarantee electricity for personnel in the emergency area.…”
Section: Elements Of An Emergency Rapid Response Systemmentioning
confidence: 99%