2019 International Conference on Power, Energy and Innovations (ICPEI) 2019
DOI: 10.1109/icpei47862.2019.8944973
|View full text |Cite
|
Sign up to set email alerts
|

The control of large scale grid-tied photovoltaic rooftop systems to avoid the power factor charge

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1

Citation Types

0
4
0

Year Published

2021
2021
2023
2023

Publication Types

Select...
2
1

Relationship

0
3

Authors

Journals

citations
Cited by 3 publications
(4 citation statements)
references
References 5 publications
0
4
0
Order By: Relevance
“…us, the PVPS is a multigeneration node grouping and hierarchical converging system [32]. PV inverter usually operates at a constant PF (usually 1) to improve power generation, which leads to uncontrollable reactive power with the change of light and temperature [12,22]. Figure 2 shows the statistical status of Hisense PVPS in Foshan, China, with inverters at 0.95 fixed PF running within a week, and the phenomenon that the power station generates electricity with relatively stable PF in PCC PV during the generation period can be seen from the figure.…”
Section: Power Modelmentioning
confidence: 99%
See 3 more Smart Citations
“…us, the PVPS is a multigeneration node grouping and hierarchical converging system [32]. PV inverter usually operates at a constant PF (usually 1) to improve power generation, which leads to uncontrollable reactive power with the change of light and temperature [12,22]. Figure 2 shows the statistical status of Hisense PVPS in Foshan, China, with inverters at 0.95 fixed PF running within a week, and the phenomenon that the power station generates electricity with relatively stable PF in PCC PV during the generation period can be seen from the figure.…”
Section: Power Modelmentioning
confidence: 99%
“…With the continuous construction and development of PV industry, as well as the increasing popularity of power substitution and power consumption upgrading, this burden will become more severe in the increasingly high penetration power system. Meanwhile, the continuous bad PF at PCC will cause assessment fines to users [22].…”
Section: Power Modelmentioning
confidence: 99%