The design coordination role at the pre-construction stage of construction projects

Abstract: The importance of the concept of prevention through design (PtD) to the alleviation of the problem of poor health and safety (H&S) management in the construction industry is widely acknowledged. It has been adopted in the regulatory framework for H&S in the UK construction industry through the Construction Design and Management Regulations 2015 (CDM 2015) which place on the project client obligations with emphasis on coordination of H&S at the preconstruction stage of the project by a client-appointed 'Princ… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
4
0

Year Published

2022
2022
2024
2024

Publication Types

Select...
7
2

Relationship

0
9

Authors

Journals

citations
Cited by 10 publications
(4 citation statements)
references
References 46 publications
0
4
0
Order By: Relevance
“…The construction industry plays a pivotal role in economic development. The long-term development of the construction industry is inseparable from reasonable project scheduling (Li et al, 2021;Zou et al, 2017;Ndekugri et al, 2022). This paper takes the extremely short construction period as the entry point and the allocation of labor resources as the variable.…”
Section: Discussionmentioning
confidence: 99%
“…The construction industry plays a pivotal role in economic development. The long-term development of the construction industry is inseparable from reasonable project scheduling (Li et al, 2021;Zou et al, 2017;Ndekugri et al, 2022). This paper takes the extremely short construction period as the entry point and the allocation of labor resources as the variable.…”
Section: Discussionmentioning
confidence: 99%
“…Quantity take-off and cost estimation (U 37 ) are intertwined with alignment optimization (U 2 ) and schedule estimation (U 35 ), as any modifications to the design can have a significant impact on resource allocation, schedules, budget, and economics of the project [90,92]. This interrelationship is crucial for effectively coordinating the design, construction, and operation phases, allowing for timely adjustments and finetuned financial management [93]. The BIM Uses 5D cost analysis (U 36 ) and 4D construction planning (U 32 ) deepen cost estimation by integrating time and financial aspects into the BIM model, providing an extended perspective of the economic impact throughout the project cycle.…”
Section: Relationship Between Bim Uses In Road Projectsmentioning
confidence: 99%
“…It aims to prevent or minimize hazards and risks by implementing safety features and hazard mitigation strategies, as well as considering human factors. Design for safety involves proactive planning [19], risk assessment [20], and the incorporation of safety standards and regulations [21], in order to enhance the overall safety and resilience of a system. In the context of resilience, a series of mathematical models and methods have been developed to evaluate resilience.…”
Section: Fire Resilience In High-tech Electronics Plants For Sustaina...mentioning
confidence: 99%