2017
DOI: 10.5703/1288284316343
|View full text |Cite
|
Sign up to set email alerts
|

The Economic Impact of Implementing Nondestructive Testing of Reinforced Concrete Bridge Decks in Indiana

Abstract: Partridge. We also thank Mr. Jeremy Hunter, who provided information about INDOT's bridge maintenance program and shared his vision for INDOT's NDT program. Finally, we sincerely appreciate the valuable contributions of the consultants, manufacturers, and vendors who shared their vast knowledge and experience in NDT testing. JOINT TRANSPORTATION RESEARCH PROGRAMThe Joint Transportation Research Program serves as a vehicle for INDOT collaboration with higher education institutions and industry in Indiana to fac… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
8
0

Year Published

2019
2019
2021
2021

Publication Types

Select...
4

Relationship

0
4

Authors

Journals

citations
Cited by 4 publications
(8 citation statements)
references
References 6 publications
0
8
0
Order By: Relevance
“…The cover meter is used to measure the depth of the concrete cover. The chloride ion penetration method measures the chloride content in the concrete which is the same measurement equation ( 1) predicts [13,14].…”
Section: Methodsmentioning
confidence: 99%
See 1 more Smart Citation
“…The cover meter is used to measure the depth of the concrete cover. The chloride ion penetration method measures the chloride content in the concrete which is the same measurement equation ( 1) predicts [13,14].…”
Section: Methodsmentioning
confidence: 99%
“…can be evaluated using the following equation(13):Where β is the reliability index. Finally the failure probability is cal-culated by subsisting F with F1 in the following integralBayesian Updating for Model ParametersBayesian updating in this research was used to update the model parameters.…”
mentioning
confidence: 99%
“…This inspection cost includes the cost of personnel, the maintenance of traffic, the snooper, laboratory analysis, and the CIP test. Hence, adding a cover meter (i.e., difference between consultant 1 and 5) to the inspection process can increase the cost of the inspection by a range of USD 500-USD 1500 [48,56]. In practice, a bridge inspection planner should consider both the reduction in uncertainty and the cost of inspection when choosing the inspection method, and this reduction in uncertainty regarding the TTT will either help in improving the maintenance decision process or it will not.…”
Section: Covmentioning
confidence: 99%
“…The first prediction at t = 2years predicted that the mean value for the durations of Stage 1 and Stage 2 from t 0 are 27 and 7 years, respectively. A concrete bridge deck is estimated to have a life span ranging from 40 to 60 years [57,58]. In this example, the life span of the concrete bridge deck was initially assumed to be 50 years.…”
Section: Time (Years)mentioning
confidence: 99%