2013
DOI: 10.4028/www.scientific.net/amr.838-841.1441
|View full text |Cite
|
Sign up to set email alerts
|

The Grouting Technology of Large-Section Highway Tunnel in Water-Rich Karst Formations

Abstract: It is a challenge to deal with karst in the construction of large cross-section tunnel. Under the background of Shuangbei Highway Tunnel, a new kind of grouting technology is introduced. According to hydrogeology, field tests are carried out to select grouting materials and proportion of mixture. Combined with the project practice, grouting construction technology is discussed such as grouting equipments, grouting parameters, operation technique, grouting ending standards. It has been proved that the technolog… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2015
2015
2015
2015

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 2 publications
0
1
0
Order By: Relevance
“…Geological predictions (Li et al, 2013;Kim, Jeon, and Park, 2012;Cheng et al, 2014;Zhou et al, 2014;Li et al, 2014;Xue et al, 2014) have been used in the YK6 +991 right tunnel face at the exit section of the Qingdao Kiaochow Bay Tunnel, using the TSP 203 plus system for the data collection ( Figure 5). The detection range is exported to YK6 +991~YK6 +870 in a total span of 121 m ( Table 1).…”
Section: Engineering Examplesmentioning
confidence: 99%
“…Geological predictions (Li et al, 2013;Kim, Jeon, and Park, 2012;Cheng et al, 2014;Zhou et al, 2014;Li et al, 2014;Xue et al, 2014) have been used in the YK6 +991 right tunnel face at the exit section of the Qingdao Kiaochow Bay Tunnel, using the TSP 203 plus system for the data collection ( Figure 5). The detection range is exported to YK6 +991~YK6 +870 in a total span of 121 m ( Table 1).…”
Section: Engineering Examplesmentioning
confidence: 99%