2018
DOI: 10.1088/1741-4326/aad91f
|View full text |Cite
|
Sign up to set email alerts
|

The IFMIF-DONES project: preliminary engineering design

Abstract: The need of a neutron source for the qualification of materials to be used in future fusion power reactors has been recognized in the European Union (EU) fusion programme for many years. The construction and exploitation of this facility is presently considered to be critical to the construction of the DEMOnstration Power Plant (DEMO). This issue has prompted the EU to launch activities for the design and engineering of the International Fusion Materials Irradiation Facility-DEMO Oriented Neutron Source (IFMIF… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

1
45
0

Year Published

2019
2019
2024
2024

Publication Types

Select...
9
1

Relationship

2
8

Authors

Journals

citations
Cited by 91 publications
(46 citation statements)
references
References 28 publications
1
45
0
Order By: Relevance
“…This novel neutron field extends the utilization of cyclotron-based neutron sources at the NPI, and it is intended for selected applications of fast neutron activation analysis, material research, and integral validation of activation cross-sections for fusion relevant technologies. It is compatible with the main energy range of planned IFMIF-DONES facility [23].…”
Section: Activation Reaction Position P0 Position P14mentioning
confidence: 86%
“…This novel neutron field extends the utilization of cyclotron-based neutron sources at the NPI, and it is intended for selected applications of fast neutron activation analysis, material research, and integral validation of activation cross-sections for fusion relevant technologies. It is compatible with the main energy range of planned IFMIF-DONES facility [23].…”
Section: Activation Reaction Position P0 Position P14mentioning
confidence: 86%
“…The DONES PEDR [4,5] aims to describe the design status of the Plant and all the integration activities required for a complete description of the facility. The degree of detail included in these descriptions is different for each system or study but the full package of documentation is able to provide an integral view of the Plant characteristics.…”
Section: The Pedrmentioning
confidence: 99%
“…IFMIF-DONES will be a complex first-in-a-kind facility and a full description would require much additional description here. Therefore, additional important information can be found in other references, such as reference [1] and reference [2].…”
Section: Ifmif-dones Facility Descriptionmentioning