2010
DOI: 10.1016/j.apergo.2009.09.003
|View full text |Cite
|
Sign up to set email alerts
|

The Operational Demand Evaluation Checklist (ODEC) of workload for railway signalling

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
6
0

Year Published

2012
2012
2021
2021

Publication Types

Select...
5
3
1

Relationship

0
9

Authors

Journals

citations
Cited by 17 publications
(6 citation statements)
references
References 21 publications
0
6
0
Order By: Relevance
“…Complexity of workstations was measured using Operational Demand Evaluation Checklist (ODEC) scores and verified by subject matter experts. The ODEC tool was developed to measure the demand placed upon the signaler due to the infrastructure on a particular workstation ( Pickup, Wilson, & Lowe, 2010 ). The tool measures quantifiable aspects of the workstation such as number of signals, number of level crossings, and speeds of trains and then ranks each entity as high, medium, or low.…”
Section: Methodsmentioning
confidence: 99%
“…Complexity of workstations was measured using Operational Demand Evaluation Checklist (ODEC) scores and verified by subject matter experts. The ODEC tool was developed to measure the demand placed upon the signaler due to the infrastructure on a particular workstation ( Pickup, Wilson, & Lowe, 2010 ). The tool measures quantifiable aspects of the workstation such as number of signals, number of level crossings, and speeds of trains and then ranks each entity as high, medium, or low.…”
Section: Methodsmentioning
confidence: 99%
“…Those factors are easily quantified could lend themselves to a future tool for predictive assessment of demands on ESs, this would be broadly similar to the approach taken in the ODEC (Operator Demand Evaluation Checklist) tool that is already used in assessing signaller workload in the UK (Pickup et al, 2010).…”
Section: Discussionmentioning
confidence: 99%
“…ODEC [10] is a tool designed as a checklist listing quantified infrastructure factors, timetable, and events that can occur in the operated workstation. The output values provide visibility on demand parameters.…”
Section: Current Workload Methods and Toolsmentioning
confidence: 99%