The optimal replacement time for Harvesters: An economic analysis
Thayron Augusto Rodrigues,
Márcio Lopes da Silva,
Haroldo Carlos Fernandes
et al.
Abstract:This research sought to identify the ideal timeframe for replacing a Harvester, used in forest harvesting, employing a comparative evaluation of different economic methods. A John Deere 1270D harvester, equipped with a 270-model head was utilized in this study. The machine’s cost per hour worked was calculated by adding fixed costs with variable costs. The methods used to determine the machine’s optimal replacement time were: the Total Average Cost (TAC) and the Equivalent Annual Cost (EAC), whi… Show more
Set email alert for when this publication receives citations?
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.