2017
DOI: 10.1108/ecam-03-2016-0085
|View full text |Cite
|
Sign up to set email alerts
|

The professionals’ perspective on the causes of project delay in the construction industry

Abstract: Abstract:Purpose Construction project delays are described as a universal problem, which has led to many empirical studies. However, most of these studies were based on the rankings by respondents, and they were rarely verified. Therefore, the purpose of this paper is to explore professional perspectives on the causes of delay in the construction industry, where there has been little explicit consideration on this subject in recent decades.Design/methodology/approach A critical literature review and a qualitat… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2

Citation Types

1
51
0
1

Year Published

2018
2018
2024
2024

Publication Types

Select...
4
3

Relationship

0
7

Authors

Journals

citations
Cited by 89 publications
(53 citation statements)
references
References 29 publications
1
51
0
1
Order By: Relevance
“…• Digital design communication tools: Digital Twin, Building Information Systems (BIM) including Revit, ArchiCAD, Navisworks, BIMx, BricsCAD, Archibus, Constructor, IntelliCAD, VisualARQ, Revizto; Geographic Information Systems (GIS) including QGIS, ArcGIS, and ArcMap [17]. The literature frequently reports that design mistakes, errors, changing orders and scopes, later approvals, and late technical decision makings were the main causes of delay in different contexts [95,99,104]. • Digital communication systems: cloud-based tools, emails, smart phones, and radio communication systems.…”
Section: Discussion and The Dec Conceptual Modelmentioning
confidence: 99%
See 2 more Smart Citations
“…• Digital design communication tools: Digital Twin, Building Information Systems (BIM) including Revit, ArchiCAD, Navisworks, BIMx, BricsCAD, Archibus, Constructor, IntelliCAD, VisualARQ, Revizto; Geographic Information Systems (GIS) including QGIS, ArcGIS, and ArcMap [17]. The literature frequently reports that design mistakes, errors, changing orders and scopes, later approvals, and late technical decision makings were the main causes of delay in different contexts [95,99,104]. • Digital communication systems: cloud-based tools, emails, smart phones, and radio communication systems.…”
Section: Discussion and The Dec Conceptual Modelmentioning
confidence: 99%
“…• Digital communication systems: cloud-based tools, emails, smart phones, and radio communication systems. Some studies report that the communication and the coordination between different parties were poor [27,95,96,99,109].…”
Section: Discussion and The Dec Conceptual Modelmentioning
confidence: 99%
See 1 more Smart Citation
“…Causes of cost overrun have been studied (Flyvbjerg 2004). For example, the lack of control increases project costs (Sinesilassie et al, 2017) and reduces project quality (Agyekum-Mensah et al, 2017).…”
Section: Introductionmentioning
confidence: 99%
“…Jordan (Sweis et al 2008), Zambia (Kaliba et al 2009), Iran (Khoshgoftar et al, 2010), Turkey (Kazaz et al 2012), India (Doloi et al 2012), Pakistan (Choundhry et al 2014, Singapore (Hwang et al 2014), Chile (Ballesteros-Pérez et al 2015), Cambodia (Santoso and Soeng, 2016), and United Arab Emirates (Mpofu et al, 2017). Some studies also addressed the delays at the pre-construction stage through identifying causes of delays from the planning and design activities (Yang and Wei 2010), making clear contract conditions on delays (Chong et al 2014), and designing a risk management methodology at the design stage (Albogamy, A. and Dawood 2015).…”
Section: Introductionmentioning
confidence: 99%