The Semmering Base Tunnel – Special challenges in construction

Abstract: The Semmering Base Tunnel (SBT) is about 27.3 km long and is being driven from the portal at Gloggnitz and from three intermediate construction accesses in Göstritz, Fröschnitzgraben and Grautschenhof. The main components of the tunnel system are the two single‐track running tunnels, cross passages at a maximum spacing of 500 m and an emergency station in the middle tunnel section, with two shafts about 400 m deep for ventilation and extraction in case of an incident. For organisational, scheduling and topogra… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
9
0
2

Year Published

2017
2017
2021
2021

Publication Types

Select...
5

Relationship

0
5

Authors

Journals

citations
Cited by 8 publications
(11 citation statements)
references
References 3 publications
0
9
0
2
Order By: Relevance
“…The Semmering Base Tunnel (SBT) is about 27.3 km long and is being driven from the Gloggnitz portal and three intermediate starting points at Göstritz, Fröschnitzgraben and Grautschenhof (Figure 1). For organisational, scheduling and topographical reasons, the tunnel has been divided into three construction contracts [1], and since May 2016 all are under construction [2].…”
Section: Project Overviewmentioning
confidence: 99%
See 1 more Smart Citation
“…The Semmering Base Tunnel (SBT) is about 27.3 km long and is being driven from the Gloggnitz portal and three intermediate starting points at Göstritz, Fröschnitzgraben and Grautschenhof (Figure 1). For organisational, scheduling and topographical reasons, the tunnel has been divided into three construction contracts [1], and since May 2016 all are under construction [2].…”
Section: Project Overviewmentioning
confidence: 99%
“…27,3 km lange Semmering-Basistunnel (SBT) wird vom Portal Gloggnitz aus und über die drei Zwischenangriffe Göstritz, Fröschnitzgraben und Grautschenhof aufgefahren (Bild 1). Aus organisatorischen, terminlichen und topographischen Gründen ist der Tunnel in drei Baulose unterteilt [1], seit Mai 2016 sind alle in Bau [2].…”
Section: Projektübersichtunclassified
“…For organisational, scheduling and topographical reasons, the tunnel ist devided into three construction contracts [1]. Since May 2016 all three are now under con struction [2].…”
Section: Generalmentioning
confidence: 99%
“…Die Hauptbestandteile des gesamten Tunnelsystems sind zwei eingleisige Tunnelröhren, Quer schläge mit einem Abstand von maximal 500 m und eine Nothaltestelle im mittleren Tunnelabschnitt. Aus organi satorischen, terminlichen und topographischen Gründen ist der Tunnel in drei Baulose unterteilt [1], seit Mai 2016 sind alle in Bau [2].…”
Section: Allgemeinesunclassified
See 1 more Smart Citation