The Three-Objective Optimization Model of Flexible Workshop Scheduling Problem for Minimizing Work Completion Time, Work Delay Time, and Energy Consumption

Abstract: In recent years, the optimal design of the workshop schedule has received much attention with the increased competition in the business environment. As a strategic issue, designing a workshop schedule affects other decisions in the production chain. The purpose of this thesis is to design a three-objective mathematical model, with the objectives of minimizing work completion time, work delay time and energy consumption, considering the importance of businesses attention to reduce energy consumption in recent y… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2021
2021
2023
2023

Publication Types

Select...
3
1

Relationship

0
4

Authors

Journals

citations
Cited by 4 publications
(1 citation statement)
references
References 29 publications
0
1
0
Order By: Relevance
“…The second most frequently considered objective is the tardiness, which measures the difference between the job due date and the job completion time. About 20% of the reviewed papers optimize some form of tardiness, namely: total tardiness (T) (e.g., [9,63,[102][103][104]), total weighted tardiness (wT) (e.g., [21,23,25,30,105]), total weighted tardiness and earliness (wTE) [59,69,97], tardiness cost (T cost ) [86,106], mean tardiness (T) [107], and maximum tardiness (T max ) [108,109].…”
Section: Other Objective Functionsmentioning
confidence: 99%
“…The second most frequently considered objective is the tardiness, which measures the difference between the job due date and the job completion time. About 20% of the reviewed papers optimize some form of tardiness, namely: total tardiness (T) (e.g., [9,63,[102][103][104]), total weighted tardiness (wT) (e.g., [21,23,25,30,105]), total weighted tardiness and earliness (wTE) [59,69,97], tardiness cost (T cost ) [86,106], mean tardiness (T) [107], and maximum tardiness (T max ) [108,109].…”
Section: Other Objective Functionsmentioning
confidence: 99%