2009
DOI: 10.1007/s11431-009-0343-6
|View full text |Cite
|
Sign up to set email alerts
|

Theoretical research on construction quality real-time monitoring and system integration of core rockfill dam

Abstract: With the enlargement of core rockfill dam construction scale and the improvement of construction mechanization level, the traditional manual construction quality control method is now difficult to meet the quality and safety demands of modern dam construction, so automatic and real-time dam construction quality monitoring with high-techs is urgently needed. The paper makes theoretical research on construction quality real-time monitoring and system integration of core rockfill dam, proposes implementation meth… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
32
0
1

Year Published

2010
2010
2014
2014

Publication Types

Select...
5

Relationship

2
3

Authors

Journals

citations
Cited by 48 publications
(33 citation statements)
references
References 4 publications
0
32
0
1
Order By: Relevance
“…Existing methods for quality assurance and quality control are mainly paper-based and labourintensive, which are unreliable and ineffective [1,[16][17][18]. In order to improve current quality management performance, a number of research efforts to develop a fully automated and intelligent quality management system have been carried out in recent years.…”
Section: Related Workmentioning
confidence: 99%
See 2 more Smart Citations
“…Existing methods for quality assurance and quality control are mainly paper-based and labourintensive, which are unreliable and ineffective [1,[16][17][18]. In order to improve current quality management performance, a number of research efforts to develop a fully automated and intelligent quality management system have been carried out in recent years.…”
Section: Related Workmentioning
confidence: 99%
“…Wang [17] proposed a Radio Frequency Identification (RFID)-based quality management system, which could be used for gathering, filtering, managing, monitoring and sharing quality data. Zhong et al [18] performed theoretical research on real-time construction quality control and proposed an implementation method for real-time quality monitoring. Boukamp and Akinci [19] developed an approach for automating the processing of construction specifications to support inspection and quality control tasks in construction projects.…”
Section: Related Workmentioning
confidence: 99%
See 1 more Smart Citation
“…Real-time control of high arch dam construction quality and progress involves collecting quality and progress information about various construction processes with new technologies, including engineering control theory, network technology, simulation technology and data fusion integration [13], then rapidly and efficiently transmitting the information over a network to a server for analysis, and finally helping managers to provide feedback to contractors in real-time. This system is made up of an information collecting layer, an application logic layer and a service decision layer.…”
Section: A Real-time Control System In a Network Environment 41 Systmentioning
confidence: 99%
“…As a result, real-time monitoring of core rockfill dam construction quality is different in monitoring content and requirements as well as monitoring technology compared with CFRD. We hence will study the method, techniques and application of core rockfill dam real-time compaction quality monitoring in this paper based on the researches referring to the specific Shuibuya monitoring system as well as our previous research achievements [10].…”
Section: Introductionmentioning
confidence: 99%