1954
DOI: 10.1001/jama.1954.02940480029008a
|View full text |Cite
|
Sign up to set email alerts
|

Therapy of Syncope

Abstract: one year. The cost of all materials and labor totaled about $350. The total time spent on the project, includ¬ ing designing, experimenting, constructing, and installing, was about one month. PROCEDURE FOR USE At the time the apparatus was installed, the following regulations for formula production by terminal heating were instituted.Wash, scrub, and thoroughly rinse all bottles, nipples, and glass covers with a suitable detergent. In washing nipples evert them and do a thorough job. The success of this met… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Publication Types

Select...

Relationship

0
0

Authors

Journals

citations
Cited by 0 publications
references
References 6 publications
0
0
0
Order By: Relevance

No citations

Set email alert for when this publication receives citations?