Time and Cost Interdependence in Water Supply System Construction Projects

Abstract: Time and price of contracted construction as well as their overrun are among highly pronounced issues in the construction practice. Numerous studies indicate that there is a dependency between these parameters at various construction markets. The paper shows the results of a research conducted on a group of 40 projects related to water supply systems carried out in the Federation of Bosnia and Herzegovina from 2001 to 2012. Collected data, obtained through interviewing chief engineers of construction companies… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2
1

Citation Types

0
17
0

Year Published

2017
2017
2024
2024

Publication Types

Select...
5
1

Relationship

1
5

Authors

Journals

citations
Cited by 14 publications
(17 citation statements)
references
References 20 publications
0
17
0
Order By: Relevance
“…Y is a construction time, X is a construction price, a is a parameter that expresses the average time needed for construction of a monetary value, and b is a model parameter that expresses the dependence of the time on the cost change [54]. is model has been tested, verified, and confirmed by many authors from many different countries around the world [13][14][15]25]. According toŽujo et al [13], one of the significant "time-cost" model limitations is that it can be applied only in the area or country of its origin because of specific economic characteristics, which are reflected on the value of model constants.…”
Section: Process-basedmentioning
confidence: 99%
See 2 more Smart Citations
“…Y is a construction time, X is a construction price, a is a parameter that expresses the average time needed for construction of a monetary value, and b is a model parameter that expresses the dependence of the time on the cost change [54]. is model has been tested, verified, and confirmed by many authors from many different countries around the world [13][14][15]25]. According toŽujo et al [13], one of the significant "time-cost" model limitations is that it can be applied only in the area or country of its origin because of specific economic characteristics, which are reflected on the value of model constants.…”
Section: Process-basedmentioning
confidence: 99%
“…During the construction period, the construction time is influenced by changes of its determining factors. us, many construction projects have not met the contracted time and have been finished with significant construction time overrun [6,[8][9][10][11][12][13][14][15][16][17]. Consequently, reaching the contracted construction time is an important problem worldwide.…”
Section: Introductionmentioning
confidence: 99%
See 1 more Smart Citation
“…They developed two type of models: for industrial projects and for projects that are not industrial. Similarly, other authors [14] investigated the correlation between time and cost overruns by applying the Bromilow's timecost algorithm.…”
Section: Literature Reviewmentioning
confidence: 99%
“…They have investigated different aspects of construction costs such as: costs estimation, costs forecasting, costs overruns, the relation cost-time etc. [11][12][13][14][15][16][17][18][19][20][21][22][23][24][25][26][27][28][29].…”
Section: Literature Reviewmentioning
confidence: 99%