Proceedings of the International Conference „Innovative Materials, Structures and Technologies” 2014
DOI: 10.7250/iscconstrs.2014.24
|View full text |Cite
|
Sign up to set email alerts
|

Time dependent factors in pile quality and capacity control

Abstract: Abstract. This work presents the results of field testing and further analysis of length estimation and capacity of piles. Concerning the CFA pile quality control, the measured elastic wave velocities examined between the 5th and 15th day after the C20/25 concrete embedding ranged from 3,000-4,000 m/s. However, the standard deviation is relatively high, the time seems to be the crucial factor. Load tests (capacity tests) as well as the tests of the length and integrity of the foundation piles belong to the set… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Publication Types

Select...

Relationship

0
0

Authors

Journals

citations
Cited by 0 publications
references
References 3 publications
0
0
0
Order By: Relevance

No citations

Set email alert for when this publication receives citations?