2012
DOI: 10.2175/193864712811708374
|View full text |Cite
|
Sign up to set email alerts
|

Translating safety factors to sources of variability and uncertainty; Model-based design evaluation for the Eindhoven WWTP

Abstract: Design guideline safety factors (SF) are based on the accumulated experience of the industry and account for the uncertainty and variability inherent in the wastewater treatment process. Models on the other hand, as implemented in most commercial simulators, do not explicitly account for uncertainty. This paper discusses how to deal with variability and uncertainty in an explicit way when using a dynamic model combined with uncertainty analysis to perform a post-project evaluation. Through the use of time seri… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
4
0

Year Published

2015
2015
2015
2015

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(4 citation statements)
references
References 21 publications
0
4
0
Order By: Relevance
“…The effect of influent uncertainty (an important source of variability) which heavily depends on the site-specific conditions (e.g. characteristics of the connected sewershed, climate conditions) has been considered but not to a great extent (Rousseau et al, 2001;Bixio et al, 2002;Benedetti, 2006;Belia et al, 2012). In addition, little effort has been dedicated to the communication of the concept of PONC which may sound abstract to many designers and decision makers.…”
Section: List Of Tablesmentioning
confidence: 99%
See 3 more Smart Citations
“…The effect of influent uncertainty (an important source of variability) which heavily depends on the site-specific conditions (e.g. characteristics of the connected sewershed, climate conditions) has been considered but not to a great extent (Rousseau et al, 2001;Bixio et al, 2002;Benedetti, 2006;Belia et al, 2012). In addition, little effort has been dedicated to the communication of the concept of PONC which may sound abstract to many designers and decision makers.…”
Section: List Of Tablesmentioning
confidence: 99%
“…The upgrade of the WWTP was deemed necessary mainly due to more stringent (Schilperoort, 2011) In this study the data and information representative of conditions prior to the upgrade of the Eindhoven WWTP were used to make a design using the proposed probabilistic design method in Chapter CHAPTER 3:. The general information and data regarding the desired capacity of the plant, effluent requirements, as well as the basic characteristics of the connected sewershed were acquired from the available reports and studies on the Eindhoven WWTP (Schilperoort, 2011;Belia et al, 2012).…”
Section: Data and Case Studymentioning
confidence: 99%
See 2 more Smart Citations