Transmission Expansion Planning Considering a High Share of Wind Power to Maximize Available Transfer Capability

Abstract: To have an effective transmission network and support free trading, the open and nondiscriminatory access to transmission services for all market participants under all conditions is of significant concern. To this end, a sufficient value of available transfer capability (ATC) is required, which can significantly affect the electricity market efficiency. This paper constructs a methodology for reinforcing an existing transmission network considering wind power investment to enhance ATC. In this regard, a bi-le… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
4

Citation Types

0
5
0

Year Published

2023
2023
2024
2024

Publication Types

Select...
4
1

Relationship

0
5

Authors

Journals

citations
Cited by 6 publications
(5 citation statements)
references
References 32 publications
0
5
0
Order By: Relevance
“…In other words, ATC approximately evaluates the safety and stability margin of the current operating point. Terefore, ATC is not only an important basis for electricity market participants to carry out transmission right transactions [1][2][3] but also a boundary condition for the power system expansion planning [4]. In modern power systems with high penetration of renewable energy and multiple types of loads, it is of great signifcance to propose an ATC evaluation method to satisfy electricity market operation.…”
Section: Introductionmentioning
confidence: 99%
See 2 more Smart Citations
“…In other words, ATC approximately evaluates the safety and stability margin of the current operating point. Terefore, ATC is not only an important basis for electricity market participants to carry out transmission right transactions [1][2][3] but also a boundary condition for the power system expansion planning [4]. In modern power systems with high penetration of renewable energy and multiple types of loads, it is of great signifcance to propose an ATC evaluation method to satisfy electricity market operation.…”
Section: Introductionmentioning
confidence: 99%
“…Te method maximizes the diference between the benefts and risks of the power increase. Moreover, ATC is an important basis for transmission system expansion planning and renewable power plant planning [4]. Terefore, electric power utility companies need to assess the ATC based on the power grid topology and power sourceload distribution.…”
Section: Introductionmentioning
confidence: 99%
See 1 more Smart Citation
“…In [14], ATC is evaluated based on an interval optimization algorithm considering the specific range of wind power uncertainty. A joint optimization approach for transmission expansion with wind power to enhance ATC is discussed in [15]. A probabilistic approach based on canonical low-rank approximation is proposed in [16] to evaluate ATC considering the uncertainties of wind power, load, and outage of transmission lines.…”
Section: Introductionmentioning
confidence: 99%
“…Maintaining an equilibrium between the availability and requirement of electricity is essential. However, it is not an easy task to invest in new power generation plants and transmission lines to meet the desires of both consumers and electric utilities [4]. This challenge requires careful planning and considering various factors, including environmental impact, cost-effectiveness, and long-term sustainability.…”